Coal Bank Road repairs
Posted: Tue Jun 04, 2013 4:07 pm
I received a call this morning telling us that a crew with a dozer is on its way the PMRP and will begin reworking to coal bank road front to back this will include new gravel throughout the length of the road. work will commence wed 6-5-13
This will mean
ROAD CREWS HAVE RIGHT OF WAY!!
drive slow, show respect for the road crews, and please be patient because the potential for you to have to wait is significant if your timing sucks. We have a great relationship with American natural gas and we don't want to tarnish it in any way.
GRAVEL WILL BE LOOSE
Please exercise steady foot control and don't rut out the gravel before it can be packed. The dozer will do a lot of good but it still has potential to be loose.
Oh yeah, good shit people! Thanks to all that donate to make this kinda thing happen!
This will mean
ROAD CREWS HAVE RIGHT OF WAY!!
drive slow, show respect for the road crews, and please be patient because the potential for you to have to wait is significant if your timing sucks. We have a great relationship with American natural gas and we don't want to tarnish it in any way.
GRAVEL WILL BE LOOSE
Please exercise steady foot control and don't rut out the gravel before it can be packed. The dozer will do a lot of good but it still has potential to be loose.
Oh yeah, good shit people! Thanks to all that donate to make this kinda thing happen!